We engaged with around 1000 people during our first consultation, talking to local residents and stakeholders about the site and how the scheme could look. We engaged in a variety of ways, including:
As a result, we learned a lot about what matters most to you and, where possible, have sought to reflect this in the proposals:
Many highlighted the steep incline from the station towards Chipping Barnet as a challenge, particularly at night and for elderly or disabled people. Improvements to pedestrian and cycle routes were welcomed, as current access is more vehicle focussed. Interchange between the tube and buses was also raised, with the incline up to Barnet Hill bus stops providing difficulties for some. We heard that some found the crossing on Barnet Hill difficult and unsafe – we have changed its location to reflect this.
Contact
highbarnet@fieldconsulting.co.uk
0207 096 7733
© 2025 High Barnet | Sitemap | Privacy Policy | Terms